Compact board-to-wire harnesses
Provide the mating board-side part, occupied cavities, pinout, wire size, finished length and installation direction. Appearance or a catalog family name does not replace a wiring definition.
CUSTOM INTERCONNECT
Application-specific wire harness development for OEM and ODM projects.
PRODUCT OVERVIEW
A wire harness is the interface between your electrical design and the finished product. Share your drawing, connector requirements, wire specification, and target quantity for a structured feasibility review.

ASSEMBLY FORMATS AND RFQ INPUTS
Organize the interface, wiring and installation requirements for your assembly. Include mating part numbers, material requirements and critical dimensions so fit and supply options can be reviewed against drawings and samples.
Provide the mating board-side part, occupied cavities, pinout, wire size, finished length and installation direction. Appearance or a catalog family name does not replace a wiring definition.
Define the viewing direction and pin numbering for both rows, with the mating interface and installation clearance. Confirm fit against drawings and samples, not housing appearance.
Specify both connectors, locks, terminals, wire colours and circuit mapping. State whether the scope includes one lead or the complete mating assembly.
No complete drawing yet? Start with interface photos, pinout information and quantity tiers, and mark undecided items as open.
Send this assembly briefWith a drawing, include its revision, interfaces, pinout and quantity tiers. With photos or a sample, add interface dimensions, wiring information and required tests. Mark undecided items as open.
APPLICATIONS
CUSTOMIZATION & TECHNICAL SCOPE
Routing, branch points, wire identification, terminals, protection, and inspection scope are defined from the customer drawing, wiring list, and application context.
TECHNICAL PARAMETERS
FOR A FASTER QUOTE, PLEASE PROVIDE
FAQ
A drawing or wiring list, connector part numbers, wire specification, annual or project quantity, application environment, and required delivery timing are a strong starting point.
A preliminary review can be scoped after the drawing, revision, connector information, wire requirements, quantity, application, and requested inspection criteria are received. Prototype timing and production feasibility remain subject to that review.
REQUEST A QUOTE
Share the drawing, part number, quantity, or application. The engineering team will review the brief and reply with the next questions.